Installation Procedure Diagram of Rail Door


Installation skills of hanging rail sliding door

1. When installing the hanging rail sliding door, pay attention to the following: First of all, ensure that the width of the two doors must be the same. Do not consider installing the hanging rail sliding door when the front and back space is relatively small. The door with better quality needs to be selected before installation. In this way, the service time can be extended for a long time. Good quality is guaranteed. Another thing to pay attention to is that when installing, pay attention to noise control so as not to disturb other people around.

2. When installing, the first thing we need to do is to prepare the required materials: a top rail, a pulley, a hanging card, a rotatable screw shaft, a small amount of screws, and a door. And the main structure of the whole door frame has been completed and passed the acceptance, and the reserved opening and side decoration have also been generally completed. The purpose of determining this is to avoid repeated construction in the future, which is time-consuming, laborious and expensive.

吊轨门

3. Then put the top rail into the pulley, cover plate, install hanging card, and make quite horizontal adjustment until it reaches the requirements. Finally, install the two doors, install the matching hardware accessories, observe whether the opening and closing are smooth, without any resistance or inclination, and then fix all bolts and screws, the entire installation process is completed. It should be noted that during the installation process, adjust and align the door seams on both sides, otherwise the whole hanging rail sliding door will not be coordinated.