How to Install Automatic Glass Door Repair Method of Automatic Glass Door (Attached Drawing)


Automatic glass door, as its name implies, is a glass door that can be switched on and off by itself. Generally, this kind of automatic glass door is installed in public places or entry door of the company. It is favored by the owners for its transparent appearance and simple shape. Today, let's learn about how to install automatic glass doors and how to repair automatic glass doors when automatic glass doors fail.

Automatic glass door, as its name implies, is a glass door that can be switched on and off by itself. Generally, this kind of automatic glass door is installed in public places or entry door of the company. It is favored by the owners for its transparent appearance and simple shape. Today, let's learn about how to install automatic glass doors and how to repair automatic glass doors when automatic glass doors fail.

Install automatic glass door

1. Determine the installation location

fixed glass partition and movable glass door leaf must be unified pay-off positioning, release the positioning line of partition and glass door according to the design drawing requirements, determine the position of door frame and guide rail, and accurately measure the ground elevation and the top elevation of door frame. Note: This step must be carried out after the construction of other processes is basically completed indoors.

2. Installation of glass partition wall

the width of the limit groove on the top of the glass partition wall and door should be 2-4mm larger than the thickness of the glass, and the groove depth should be between 20-30mm to facilitate glue injection. The installation method can lead out two metal decorative board edges from the bullet center line, and then install the limit groove on the top of the door frame according to the edges. Layer of wooden blocks of the slot is adjusted. Adjust by increasing or decreasing the backing plate.

3. Installation of steel frame

when the door body is relatively narrow and low, the steel frame is directly hit on the wall above the door opening of the civil engineering, and it is tightened with expansion screws; When the door body is relatively wide and high, it is divided into electric welding angle iron above the door opening to close the channel steel, or set a door in door and burn a door hole again. After the steel frame is burnt, it needs to be painted with paint to prevent the steel frame from rusting. Then determine the glass size.

如何安装自动玻璃门 修自动玻璃门的方法(附图)_1

4. Installation of track

automatic door special track should be fixed on the steel frame, and the height of the track should be determined by the glass size, parallel to the steel frame, and the left and right height error should not exceed 2mm. The track is fixed on the steel frame with self-tapping screws. Generally, a single track needs 8-12 self-tapping screws, which are determined according to the length of the track. The surface of the installation track should be flat without burrs, ensuring that the aluminum alloy track is horizontally and vertically and firmly installed. Please use spirit level to measure the level during installation.

5. Installation of motor

the automatic glass door transmission control chassis and automatic detection device are fixed and installed on the steel beam, and the fixed connection methods include the steel beam punching bolt fixing method and the welding connecting plate on the steel beam and then connecting and fixing method. It should be noted that the drilling or welding connecting plate on the steel beam should be completed before the installation of the steel beam.

6. Install the rigid door frame

nail the square wood of the door frame according to the center line of the bullet, and then use plywood to determine the external dimension and position of the door frame column (note that the size of decorative surface should be reduced). Finally, the metal decorative surface is outsourced. When the package is wrapped, the facing butt joint should be placed in the middle position on both sides of the glass installation. The joint position must be accurate and vertical.

如何安装自动玻璃门 修自动玻璃门的方法(附图)_2

7. Glass installation

use glass sucker to suck the thick glass tightly, and then hold the suction cup to lift the thick glass plate through 2-3 people and stand it up and move it to the installation site to prepare it in place. Positioning method: the upper part of the glass should be inserted into the limit groove at the top of the door frame, and then the lower part of the glass should be placed on the right center line on the base support, and the installation positions of the door frames on both sides should be well, make both sides of the thick glass just seal the metal facing seam of the door frame, and make it impossible to see the facing seam inside and outside.

8. Glass fixing

the inside and outside nails on base support Wood hold the thick glass in the middle, but leave a gap of about 4mm from the thick glass plate, then apply a brush on the flat wood strip all-purpose adhesive stick the facing metal plate on the square Wood and two flat wood strips.

9. Silicon sealant sealing

inject base support into the gap on both sides of the top root slot and on both sides of the glazing rebate silicon sealant and at the opposite seam between the thick glass and the door frame column. The injection sequence should start from the end of a gap to end, and must not stop halfway. The operation essentials are: to hold the caulking gun pressing handle, the force should be uniform, and the speed of moving along the gap should also be uniform, that is, with the extrusion of silicon sealant, the glue injection port should be moved at a constant speed, make silicon sealant form a uniform straight line at the gap. Finally, use a plastic sheet to scrape off the excess silicon sealant and wipe off the glue with a clean cloth.

10. Docking between glass

the thick glass plate of the fixed part must be assembled with two or more pieces due to the width of over dimension. The alignment and splicing of the two pieces will inevitably form a joint, 2-3mm distance should be left for joints (glass cut for joints must be used upside down). After the glass is fixed, silicon sealant should be put into the gap. After filling, squeegee should also be leveled with plastic sheet to make the gap form a clean uniform straight line. Clean the glue on the glass surface with a clean cloth.

11. Debugging of automatic glass door

turn on the power supply and adjust the detection angle and reaction sensitivity of the microwave sensor to achieve the best working state.

Repair automatic glass door

如何安装自动玻璃门 修自动玻璃门的方法(附图)_3

figure 1 of automatic glass door repair

如何安装自动玻璃门 修自动玻璃门的方法(附图)_4

figure 2 of automatic glass door repair

how to install the automatic glass door and when the automatic glass door fails, the method of repairing the automatic glass door is introduced here, if you want to know more about the products of doors and windows and related knowledge, please continue to pay attention to Zhonghua door and window network.

(Graphic Source: Qi Jia today's headlines, invasion and deletion)