Whether it is a new house decoration or old house renovation, it is a long process. For example, broken bridge aluminum windows can be customized. It can not be completed in one day or two days. It also needs to be measured and made, the installation consists of three important parts, and each family has different requirements for Windows, such as the color of windows, whether the glass is tempered or not, and whether there is curved arc design directly affects the customization cycle. Next, let's take a closer look at it in detail. How many situations will it take to introduce broken bridge aluminum windows customization?
In the first case, the window color is the original color of the profile, the glass does not need to be tempered, there is no curved arc design, and the customization cycle is about one week.
The second situation: the color of the window needs to be sprayed. For example, if the original color of the profile is white, consumers should change it to Brown according to the indoor color, so spraying is needed. On the premise that the glass is not tempered and has no curved arc design, the customization period is about 10 to 15 days.
The third situation: the color of the window and the glass are processed, the design is non-curved, and the customization cycle is about 10 to 15 days. Spraying and tempering can be carried out at the same time, striving for expensive time for consumers.
The fourth situation: when the window color, glass and curved arc design all exist, the cycle will be longer, and it will take 15 to 20 days.
The cycle time of broken bridge aluminum windows customization mentioned above includes not only the time of making in the factory, but also the day of measurement and the day of installation, both of which are free of charge. If consumers are in a hurry to install it, explain when signing a contract with the designer that the design will be arranged as far as possible for consumers. What we need to know here is that the processing will not take long, it mainly arranges the construction period and installation time.