Many people usually focus on the quality and performance when choosing door and window products, but it is easy to ignore the installation of doors and windows. No matter how good the door and window products are, poor installation will also affect the performance of doors and windows, so how to install doors and windows is a knowledge. The following Kang Ying doors and windows will introduce the installation process of doors and windows to everyone!
1. Installation position of doors and windows
in front of the custom door and window, the installation position and size of the door and window should be confirmed, and the position should be confirmed according to the elevation size on the drawing. The Edge line of the top window should prevail. Only when there is a design drawing can the error be reduced more accurately, when measuring, the minimum size should be taken as the point of size, and the window edge line should be led down by Line Pendant or theodolite, and chemical fiber marks should be marked everywhere.
2, door and window installation anti-corrosion treatment
before installing doors and windows, pay attention to the anti-corrosion treatment. First fix the cloak on the aluminum doors and windows according to the requirements of the drawings. The anti-corrosion treatment is to apply the anti-corrosion coating or paste the plastic film, when installing aluminum doors and windows, it is better to use stainless steel for connecting parts to prevent electrochemical reaction of materials.
3, doors and windows installation and fixing
the service performance and service life of doors and windows are also closely related to installation and fixation. Therefore, when we install doors and windows, we remember that we need to use metal expansion bolts and live plastic bolts to fix them, after checking, you can do it. However, the installation accessories of the current door and window products are relatively good, as long as you follow the steps.
4, door and window installation gap treatment
after the doors and windows are installed and fixed, the gap is handled, if the gap between the window frame and the wall after installation is less5cm, you can fill the gap with Styrofoam, and then apply it with waterproof adhesive, which can not only fill the gap, but also ensure that there will be no water leakage, but if the gap is very large, you need to fill bricks or cement slurry (it is better to reduce errors in good size). Between doors and windows and walls, fill them with polyurethane foam glue first, and seal them with silicone sealant for external use. This method solves the crack problem. However, you should pay attention to the color matching when using silicone adhesive.
Foshan city kangying doors and windows it is an enterprise integrating R & D, production, sales and service. Currently, it has 200 million square meters of modern production base with complete product series. Eight new products were launched in the first half of 2020. Welcome to consult for details!